OUR HISTORY
HP & CP Australia Pty Ltd is 100% Australian owned by the Pereira family.
The family formally began operations in 2014 from a small factory in Melbourne’s South East. Later recruiting experienced and dedicated staff, which grew the company into a reputable quality driven Switchboard Manufacturer, working on significant projects within Australia, Pacific Islands and Papua New Guinea.
With decades of experience in the electrical industry, Henry Pereira first began his career in Australia in the mid 1970’s with ASEA/ABB. From there, Henry was recruited by NHP as their Production Manager for over five years. Amongst other highlights, this role took him to Japan to assist the introduction of the Terasaki Tembreak into the Australian market.
After that, Henry worked as a project engineer with UMK for over ten years, working on multi-million dollar international projects, including the significant Hong Kong airport project and City link tunnel. Late in the new century saw Henry registered HP&CP Australia Pty Ltd and provide his wealth of experience as a sub-contractor within the switchboard industry. Michael Pereira was later to follow in his fathers footsteps.
Michael had been influential in the design and engineering of their companies AS/NZS 61439 verified enclosure system, successfully tested to 3200A and 50ka for 1sec, with:
- ABB
- Schneider
- Terasaki
- LSIS
HP & CP Australia are proud of their reputation for manufacturing quality electrical switchboards, complying to AS/NZS 61439 Standards. They specialize in design and manufacture for a wide range of markets, including:
- Mining
- Utilities, including Substation Protection
- Defense
- Infrastructure
- Medical and Aged Care
- Education
- Renewables
- Industrial and Commercial
HP&CP Australia are driven by quality assurance and a focus on customer service.
OUR VISION
HP & CP Australia endeavour to exceed their customers anticipated level of quality and reliability, simultaneously at competitive rates.
They believe their business is only as good as their last project. Therefore, they have implemented a strict quality assurance and functional testing into all their projects.